Used IMS Dredges

Used Dredge Information Form

This form gives IMS Sales Representatives the opportunity to preview your dredging needs before they contact you. Please fill out as much as you can and submit the form when you are done. The only fields that you are required to fill out are the General Information fields.
* = Required Field
  
General Information:

* Company Name:
 
* Estimated Budget:
  (Numeric Only)
* Address:
 
* City:
 
* State/Province:
 
* Country:
 
* Zip or Mail Code:
 
* Phone:
 
Fax:
 
Website:
 
* First Name:  
Phone or ext:
 
* Last Name:  
I need info on:   IMS Dredges Dredge Contractors
* Your Email:
 
     
Your Title:
 
           
 
Company Classification:
Consultant
Dredge Contractor
Mining Company
Industrial Entity
Government Agency
Municipality
Home Owners' Association
Marina Owner
Other
 
Project Information:
Canal Maintenance
Aquatic Vegetation Harvester
Pond Maintenance
Industrial Waste Cleanup
Lake Restoration
Sediment Removal
Sand Mining
Other: 
Sludge Removal

 
Project Location (Country, State, City):
 
Equipment Requirements:
Maximum pumping distance:
Length of floating pipeline:
Maximum pumping elevation:
Maximum dredging depth:
Minimum dredging depth:
 
Materials to be dredged (check all that apply):
Coal Fines
Peat
Heavy Minerals
Paper Mill Sludge
Silt
Animal Waste
Municipal Sludge
Mud
Shrimp Harvesting
Fly Ash
Trash
Coarse Sand
Lime Sludge
Vegetation
Fine Sand
 
Materials to be dredged are:
Very Compact
Moderate
Free-flowing
 
Overgrowth Characteristics:
Cattails
Swamp Grass
Hyacinths
Mangroves
Hydrilla
Papyrus
Tree Roots
Tree Stumps
Small Trees

 
Ambient Characteristics:
Calm water:  
Continuously Occasionally Hardly ever
Rough water:  
Continuously Occasionally Hardly ever
Swells less than 1 ft (30 cm) high:  
Continuously Occasionally Hardly ever
Swells over 1 ft (30 cm) high:  
Continuously Occasionally Hardly ever
Waves less than 2 ft (60 cm) high:  
Continuously Occasionally Hardly ever
Currents of 1 to 2 knots:  
Continuously Occasionally Hardly ever
Currents over 2 knots:  
Continuously Occasionally Hardly ever
 
Project Constraints:
Start Date:
Finish Date :
Date Dredge needs to be on site:
The project at hand requires volume of material to be dredged within months.  The dredge must work shifts per day and hours per day, and must work days per month and months per year.
 
Mobility:
Patented STARWHEEL DRIVE® self-propulsion
Standard cable drive



By completing this form, you are giving us permission to add you to our mailing list.